GREVARATHE SECOND WORLD WAR
THE HISTORICAL ARCHIVE
1208 — 1233

Original source · Visual archive

Silvians secure a Velen bridgehead

Uploaded Grevara source 5: Silvians secure a Velen bridgehead
Uploaded original · open the image below for full-size reading · Source 005

Open full-size image

Searchable transcription · OCR may contain errors

This is uncorrected machine transcription. The uploaded image is authoritative for names, punctuation and quotations.

TRUTH PEOPLES
IN TURBULENT TIMES NATIONS
A STRONGER A MORE STABLE
TOMORROW WORLD
GREVARA NEWS NETWORK
VOL. XLVI, NO. 578 WESTERN LINE EDITION 20 JANUARY 1225

SILVIANS SECURE AVELEN BRIDGEAEAD

A limited crossing gives the 7th Army ground beyond the river

VELEN RIVER — Silvian ~ i
ifn seus lied THE SITUATION
bridgehead after fighting :

peer rem AT A GLANCE

of the river. Engineers y :
work to strengthen the ‘ 2 Rr 3 ( A limited

connection with the near - iy : Ria bridgehead is held.

bank while Teran troops
counterattack the exposed

perimeter. = : = Teran |
The 7th Army moves 4 Yay an ‘ 2 = =, | counterattacks

men and supplies into "4 ; sana continue.

the lodgment as conditions : f

permit. Heavy vehicles ‘ | ; wt a

remain dependent on \ i I Heavy traffic

suitable crossing \ ; awaits crossing

capacity, and not every 7 : n

route can carry them. 2 \ "1 Nw capacity.

The foothold is too

narrow to support an

immediate sweeping

advance.

Elements of the Teran
81st Elite Corps maintain W
pressure from lira P| SS EF 4.
positions. Lathorne’s Silvian infantry cross the Velen River on a pontoon bridge as engineers secure additional sections.
headquarters reports
ground beyond the water f
but emphasizes the
continuing struggle to
hold it. The crossing
changes the local situation
without settling the
wider campaign.

Silvian troops establish defensive postions on the far bank. GNN PHOTO /T. KELL | Supply vehicles wait on the near bank for crossing capacity.

A FOOTHOLD BEYOND THE WATER | ENGINEERS AT WORK _| PRESSURE ON THE FLANKS

The crossing provides new ground Dependable access remains Teran positions around the lodgment
but little depth. essential to holding the perimeter. restrict its expansion.

GN PHOTO /R, VELAS

COURAGE INFORMS. SACRIFICE BUILDS TOMORROW.
\.GREVARA NEWS NETWORK —A MORE STABLE WORLD ‘ALL THE WORLD, ALL PERSPECTIVES.

i

Provenance

Wwii 2/A607284A-4CD2-4E4E-8773-0A373CC827B6.PNG

Source identifier: 005